LIST OF AWARDED
PACKAGES UNDER MPUSIP -AF ( ADB Loan No. 3974 IND): AS ON DECEMBER 2021 |
|
S.No. |
Package |
Town |
Cost (Rs. in Crore) |
Salient features |
Physical Progress in % |
Financial progress in % |
Remark |
1 |
1D |
Jawar |
19.04 |
Anicut |
0% |
0% |
Notification of award issued. Contract to be signed. |
Intake well |
Raw Water Mains |
RW Pumps |
Water Treatment Plant |
Clear Water Mains |
CW Pumps |
Distribution Network |
Over Head Tanks/UGR(Existing) |
HSC Connection |
2 |
1E |
Sanchi |
67.15 |
Anicut |
7% |
8% |
Awarded , work is in progress |
Floating Pontoon / Intake Well |
RWRM (11.130 km) |
WTP 2.5 MLD |
Pump Sets and Electrical Equipment |
CWRM (4.141Km.) |
OHT-I-200 KL |
GSR -III-450KL |
GSR -I (Renovation of Existing) |
GSR-II (Renovation of Existing) |
Distribution Network |
House Connection |
Pachore |
Anicut |
RWRM (0.45km) |
WTP 2.5 MLD |
Electro-Mechanical Works |
CWRM ((5.21 Km) |
OHT-I-800KL |
OHT-II-200KL |
Distribution Network |
House Connection |
Total Road restoration |
3 |
2E |
Shahpura |
40.34 |
Intake well |
39% |
36% |
Awarded , work is in progress |
RWRM (6455 Rm.) |
WTP - 2.70 MLD |
CWRM (1725 Rm.) |
OHT 150 KL |
Distribution Network |
House Connection (3930 Nos) |
Chhanera |
Rehabilitation of Existing Intake well & Pump House |
RWRM (500 Rm.) |
Rehabilitation of Existing WTP |
CWRM (200 Rm.) |
Rehabilitation of Existing OHT |
Distribution Network |
Rehabilitation of Existing Distribution System (45000 Rm) |
House Connection (4967 Nos) |
Total Road restoration |
Electro-Mechanical Equipments |
4 |
2J |
Nepanagar |
34.38 |
Intake well |
57% |
49% |
Awarded, work is in progress |
RWRM (780 Rm.) |
WTP - 7.70 MLD |
CWRM (7446 Rm.) |
GSR - 1900 KL |
Distribution Network |
House Connection |
Total Road restoration |
Electro-Mechanical Equipments |
5 |
3C |
Polay kalan |
72.61 |
Raw Water Pmup Set |
0% |
0% |
Notification of award issued. |
Clear Water Pump Set |
OHT |
Raw Water Rising Main |
Clear Water Rsing main |
Distribution network |
HSC No. |
Hatpiplya |
1 no. Annicut |
Water Treatment Plant |
Raw Water Sump |
Clear Water Sump |
OHT - I |
Raw Water Rising Main |
Clear Water Rising main |
Distribution Network |
HSC No. |
Bagli |
OHT |
Sumpwell |
Clear Water rising main |
Distribution Network |
HSC No. |
6 |
3E |
Ratlam (Dhamnod) |
20.32 |
Intake well |
5% |
5% |
Awared, work is in progress |
RWRM (15000 Rm.) |
WTP - 2.70 MLD |
CWRM (2298 Rm.) |
OHT - 250 KL |
Distribution Network |
House Connection (1980 Nos) |
7 |
3F |
Athana |
11.82 |
Raw Water Sump |
6% |
0% |
Awared, work is in progress |
Clear Water Sump |
OHT - I |
Raw Water Rising Main |
Clear Water Rising main |
Distribution Network |
HSC No. |
8 |
4C |
Gohad |
135.13 |
Intake Well |
0% |
0% |
Notification of award issued. Contract to be signed. |
WTP |
OHT |
Clear Water Rising / Gravity Main |
Distribution Network |
HSC |
9 |
4E |
Antari |
47.88 |
WTP |
1% |
7% |
Awarded , work is in progress |
Raw & Clear Water Pump |
OHT |
Clear/ Raw Water Rising Main |
Distribution Network |
HSC No. |
Biloua |
Intake Well |
WTP |
Raw & Clear Water Rising / Feeder / Gravity Main |
Distribution Network |
Pichhore |
River Ponding Structure |
Intake Well |
Water Treatment Plant |
Raw & Clear Water Rising / Feeder / Gravity Main |
Distribution Network |
HSC No. |
10 |
4G |
Kailaras |
86.48 |
Intake Well |
0% |
0% |
Notification of award issued. Contract agreement has ben signed. Letter of
commencement has been issued. |
WTP |
OHT |
Raw & Clear Water Rising/Feeder/Gravity Main |
Distribution Network |
Jhundpura |
Construction of Tube wells |
WTP |
OHT |
Raw Water Rising / Gravity Main |
Clear Water Rising / Gravity Main |
Distribution Network |
House Service Connection No. |
Joura |
Construction of Tube wells |
Clear Water Sump cum Pump House |
OHT |
11 |
4J |
Akoda |
13.46 |
Water Treatment Plant |
0% |
0% |
Awarded , work is in progress |
Raw Water Sump |
Clear Water Sump |
OHT - 2 |
Raw Water Rising Main |
Clear Water Rising Main - |
150 mm Dia K9 |
200 mm Dia K9 |
Distribution Network |
House Service Connection |
12 |
5C |
Chand |
16.35. |
CWRM- 12.798 Km |
32% |
24% |
Awarded , work is in progress |
Sump & Pump House 60kl Capacity |
OHT 100 KL |
OHT 60 KL (Revised 100 KL) |
OHT 50 KL |
Distribution Network -34.8 Km |
House Connection- 2320 Nos |
Road Restoration (47.598 KM) |
13 |
5D |
Kymore |
43.97 |
CWRM (22169) RMT |
5% |
2% |
Awarded , work is in progress |
Distribution system (45343) RMT |
OHT 200 KL & 20 m staging height |
OHT 250 KL & 14 m staging height |
Road Restoration |
Pumps Sets & PLC Panels |
Operation services |
Topographical survey 73.00 KM |
Vijay Raghogarh |
Anicut 4.5 mtr height 200 mtr length |
14 |
Intake Well |
WTP & Compound Wall |
OHT 230 KL18 m height |
RWRM- (153) RMT |
CWRM (1887) RMT |
Distribution Network - (23242) RMT |
Road Restoration |
Pumps Sets |
Topographical survey 44.675KM |
Compound wall |
15 |
5E |
Barela |
19.47 |
Intake Well - 05 M Dia & 18 M Height |
2% |
0% |
Awarded , work is in progress |
RWRM- 12.258 KM |
WTP- 1MLD |
CWRM- 01.584KM |
Overhead tank- 320KL Capacity |
Distribution Network - 26.677 KM |
House Connection- 3360 Nos |
Road restoration |
16 |
5F |
Saikheda |
66.97 |
Intake Well- 06M Dia & 22 M Height |
72.61% |
68% |
Awarded , work is in progress |
RWRM-7.657 Km |
WTP- 6.5 MLD |
CWRM- 8.638Km |
CLEAR WATER SUMP- 70KL |
OHT 760 KL |
OHT 50 KL |
Distribution Network - 29.067 Km |
Air Valve |
HDPE Water meter box |
Domestic Water meter |
MS Black pipe for encasing MDPE pipe at drainage crossings |
Electrofusion tapping ferrule |
MDPE Pipes |
Electromagnetic bulk flow meter |
Sluice Valve |
Dismantling of CC road |
Earth work Excavation |
HOUSE CONNECTION- 2240 Nos |
Road restoration(45.362Km) |
Topography survey |
Door to door survey |
|
Salichouka |
CWRM- 23.526 Km |
DISTRIBUTION- 35.511 Km |
Air Valve |
HDPE Water meter box |
Domestic Water meter |
MS Black pipe for encasing MDPE pipe at drainage crossings |
Electrofusion tapping ferrule |
MDPE Pipes |
Electromagnetic bulk flow meter |
Sluice Valve |
Dismantling of CC road |
Earth work Excavation |
Road restoration(59.037Km) |
topography survey |
door to door survey |
|
Chichli |
CWRM-27.24KM |
Sump & Pump House 40KL Capacity |
Air Valve |
HDPE Water meter box |
Domestic Water meter |
Sluice Valve |
Dismantling of CC road |
Excavation work |
OHT 300 KL |
OHT 50 KL |
Dist. 40.54km |
House Connection- 2690 Nos |
Road restoration(53.755Km) |
Water meter box |
MDPE Pipe |
Electrofusion tapping ferrule |
Topography survey |
17 |
5H |
Malajkhand |
71.25 |
Anicut - 88.00 M Length and 6.00 M High |
25.90% |
32% |
Awarded , work is in progress |
Intake Well - 06 M Dia & 8.10 M Height |
RWRM- 1.665 KM |
WTP- 3.81 MLD |
CWRM- 32.956 KM |
OHT-1- 300 KL (Mehgaon) |
OHT-2- 225 KL (Birsa Market) |
OHT-3- 125 KL (Bhimjori) |
OHT-4- 60 KL (Anditola |
OHT-5- 50 KL (Rahengi) |
OHT-6- 50 KL (Chindi tola) |
OHT-7- 50 KL (Lora) |
GSR- 50 KL (Sarai tola) |
SUMP & PUMP HOUSE 10KL Capacity |
Sump & Pump House 15KL Capacity |
Distribution Network - 140.693 KM |
House Connection- 6200 Nos |
Door to Door - 6200 Nos |
Road restoration (174.569Km) |
|
Baihar |
Anicut - 79.00 M Length and 3.50 M High |
Intake Well - 06 M Dia & 9.0 M Height |
RWRM- 4.9214 KM |
WTP- 1.72 MLD |
Excavation |
Sluice vale |
Air Valve |
Door to Door Survey-3351 |
Topographic Survey-4.5 KM |
Sub item cost of Different component |
|
6% |
4% |
|
18 |
5I |
Bahamani Banjar |
39.33 |
Construction of Intake and Raw water pump house |
Awarded , work is in progress |
WTP |
RWRM |
Clear water feeder main |
Pumps of clear water |
OHT |
Distribution network |
HSC No. |
|
Niwas |
Intake Well |
Raw Water Rising main |
Raw water pump |
WTP |
Clear water pump |
Clear water Feeder main |
OHT |
|
Distribution Network |
HSC No. |
19 |
6G |
Harpalpur |
68.55 |
Intake Well |
6% |
4% |
Awarded , work is in progress |
RWRM |
WTP 3.36 MLD |
CWRM |
OHT (210 KL) |
OHT (160 KL) |
OHT (230 KL) |
Distribution Network |
House Service Connections |
Ghuwara |
CWRM |
OHT (250 KL) |
OHT (210 KL) |
OHT (100 KL) |
Distribution Network |
House Service Connections |
Badgaon |
Anicut |
Intake Well |
RWRM |
WTP 3.01 MLD |
CWRM |
OHT (100 KL) |
OHT (100 KL) |
Distribution Network |
House Service Connections |
20 |
6H |
Kari |
68.69 |
Intake Well |
|
|
Notification of award issued. Contract agreement has been signed. |
WTP |
RCC Reservoirs (Over Head Tanks and Ground or Under Ground Reservoirs) |
Raw Water Rising / Gravity Main |
Distribution Network |
HSC No. |
Lidhora Khas |
RCC Reservoirs (Over Head Tanks and Ground or Under Ground Reservoirs) |
Clear Water Rising / Gravity Main |
Distribution Network |
HSC No. |
Jerone Khas |
|
River Ponding Structure |
Intake Well |
WTP |
RCC Reservoirs (Over Head Tanks and Ground or Under Ground Reservoirs) |
Raw Water Rising / Gravity Main |
Distribution Network |
21 |
6I |
Shapur |
17.47 |
Intake Well |
0% |
0% |
Recentely Awarded |
WTP |
Raw Water Rising / Gravity Main |
Clear Water Rising / Gravity Main |
Distribution Network |
22 |
6J |
Satai |
116.54 |
CWRM |
6% |
2.35 |
Awarded , work is in progress |
OHT (50 KL) |
Distribution Network |
House Service Connections |
Bijapur |
Anicut |
Intake (8 M Dia) |
RWRM |
WTP 7.16 M |
CWRM |
OHT (250 KL) |
OHT (250 KL) |
OHT (150 KL) |
Distribution Network |
HSC |
Khargapur |
CWRM |
OHT (100 KL) |
Distribution Network |
HSC |
Jatara |
CWRM |
OHT (500 KL) |
OHT (300 KL) |
Distribution Network |
HSC |
|
23 |
6K |
Bada Malhera |
24.03 |
River Ponding Structure |
0% |
0% |
Notification of award issued. Contract to be signed. |
Raw Water Pump Set |
Clear Water Pump Set |
OHT |
Clear Water Rising Main |
Distribution Network |
HSC No. |
0% |
0% |
Notification of award issued. Contract agreement has been signed. Letter of
commencement has been issued. |
24 |
6L |
Patera |
9.41 |
GSR - I |
Raw Water Rising main |
Clear Water Rising Main |
Distribution Main |
Distribution Network |
HSC No. |
25 |
7C |
Kotar |
72.95 |
Intake Well-6 M Dia |
39% |
39% |
Awarded , work is in progress |
RWRM- 20.309Km |
WTP- 4.4 MLD |
CWGM- 20.196 Km |
Total |
CWRM/CWGM- 5.468 Km |
Clear Water Sump 50KL |
OHT 180 KL |
Distribution Network - |
House Connection- 1756 Nos |
Road Restoration (79.325Km) |
Birsingpur |
CWGM- 12.546 Km |
OHT 460 KL |
Distribution Network - |
House Connection- 3395 Nos |
Road Restoration (49.605Km) |
Jaitwara |
CWRM- 2.113 Km |
Clear Water Sump |
OHT 150 KL |
Distribution- 33.434 Km |
House Connection- 2252 Nos |
Road Restoration (35.547 Km) |
Kothi |
CWRM- 11.394 KM |
OHT 230 KL |
Distribution Network |
House Connection- 2102 Nos |
26 |
7D |
Amarpatan |
44.66 |
Intake Well - 05 M Dia & 18 M Height |
6% |
5% |
Awarded , work is in progress |
RWRM- 19.100 KM |
WTP- 2.45 MLD |
CWRM- 10.454KM |
Brake Pressure Tank (BTP)- 190KL Capacity |
Distribution Network - |
House Connection- 3744 Nos |
Road restoration (174.569Km) |
New Ramnagar |
Distribution Network - 79.444 KM |
27 |
7E |
Mangawan |
43.72 |
Anicut (60M Length, 3.5M Height) |
1% |
0% |
Awarded , work is in progress |
Intake Well - 04 M Dia & 12.5 M Height |
RWRM & CWRM- 12.091 KM |
WTP- 1.60 MLD |
CWRM- 00 KM |
OHT- 360KL Capacity |
Distribution Network 41.95 KM |
House Connection- 2758 Nos |
Excavation & CC Braking, Back filling, Road restoration |
Electrical, Pump, valve, PLC, Management, Other |
|
Rampur Naikin |
Anicut (120M Length, 3.5M Height) |
Intake Well - 04 M Dia & 12.5 M Height |
RWRM & CWRM- 7.049 KM |
WTP- 1.60 MLD |
CWRM- 00 KM |
OHT- 350KL Staging 15M Ward 10 |
OHT- 400KL Staging 15M Ward 15 |
OHT- 450KL Staging 15M Ward 14 |
OHT- 500KL Staging 15M Ward 8 |
Distribution Network - 50.484 KM |
28 |
7G |
Maihar |
103.62 |
Anicut- 80M LENGTH & 4.5 |
25.50% |
17.02% |
Awarded , work is in progress |
BP Tank-650 kl |
CWRM- 6590 M, DI, K-9 |
OHT - 1550KL,15 Mtr Staging, |
OHT - 2000KL,10 MTR |
OHT - 350 KL,15 Mtr Staging, |
Sump -350KL, ZONE-5 |
GSR -50KL |
Distribution Network - 186.186 Km |
House Connection 12430 Nos |
29 |
7H |
Pasan |
36.69 |
River Ponding Structure |
2% |
0% |
Awarded , work is in progress |
Intake Well |
WTP |
OHT |
Raw Water Rising / Gravity Main |
Clear Water Rising / Gravity Main |
Distribution Network |
HSC |
29 Pkgs |
53 Towns |
|
|
|
|
|