 Chlorine Contact Tank in Sanawad (Contract Package 2H)
Centrifuge House and Sludge Sump in Sanawad(Contract Package 2H)
PQC work in Gautampura (Contract Package 2A)
Flash Fixer Agitator in Kasrawad (Contract Package 2B)
CLF bridge installation exist WTP 3.12 MLD in Kasrawad (Contract Package 2B)
GAIL Main Gate Crossing Work in Raghogarh (Contract Package 4I)
Plinth Beam for Admin Building in Dhamnod (Contract Package 2C)
Chemical House in Kukdeshwar (Contract Package 3A)
SBR in Barwaha ( Contract Package 2G)
Tiling work at Clear Water Channel room at WTP in Mandav (Contract Package 2C).
Anicut at Mauganj (Contract Package 7A)
Pantoon Installation Work in Progress in Khand ( Contract Package 7B)
Painting Work in Progress at 2650 KL OHT Hazi Nagar in Bhind (Contract Package 4B)
Water Meter Installation Work in Progress in Hatta (Contract Package 6D)
1.65 MLD WTP in Phuphkalan (Contract Package 4A)
Intake Well in Alampur (Contract Package 4A)
WTP Drain Brick Work in Kurawar (Contract Package 1A)
HDPE Pipe Line Excavation for Leakage Repairing Work in Boda (Contract Package 1A)
Hydrotesting of HDPE Pipe Line in Kothari (Contract Package 1A)
Filter house in Vijaypur (Contract Package 4D)
WTP in Bairad (Contract Package 4D)
Intake Well in Bairad (Contract Package 4D)