    DETAILS OF WORK UNDER WATER SUPPLY SECTOR
BPL/WS/01: Supply, Installation and Maintenance of Electromagnetic Flow Meters, Clamp on  Ultrasonic Flow Meters and Bulk Consumer Meters.
         13 Nos. Electromagnetic Meters at Raw Water and Clear Water Pumping Stations
         2 Nos. Portable Ultra sonic clamp on type Meters
         Meter reading and Maintenance for 2 years
         Training to BMC staff
BPL/WS/02 : Rehabilitation of existing Raw Water Pumping Stations, Clear Water Pumping          Stations, replacement of Rising Mains around Upper Lake.
         Rehabilitation of Yacht Club-I, Yacht Club-II, Karbala, Bairagarh, Kamla Park Raw Water  Pumping Stations including all civil, mechanical and  electrical works.
         Rehabilitation of Shyamla 2.0 MGD, Bairagarh Clear Water Pumping Stations including all civil, mechanical and  electrical works.
         Replacement of raw Water pumping main for Arera WTP and BHEL WTP.
BPL/WS/03 : Rehabilitation of  7 Water  Treatment Plants around Upper Lake. 
Rehabilitation of Shyamala 4.5 MGD, Shyamala 2.0 MGD, Bairagarh 1.0 MGD, Idgah 3.0 MGD, Arera 5.0 MGD, Badal Mahal 1.0 MGD, Pulphukta 3 MGD WTP including all civil, mechanical and  electrical works.
BPL/WS/04 : UFW reduction in a Pilot Area (Koh-E-Fiza).
         Bulk metering and consumer metering in Pilot Area (about 2500 connections).
         Leak Detection and Repairs. (Acceptable limit 15lits/connection/hour).
         Repairs replacement of below 100 mm dia pipe lines.
         Replacement of service connections.
BPL/WS/05 : Leak detection and rectification in pipelines of 300 mm diameter and above
         Repairs of all visible leakages.
         Detection of hidden leaks using leak detection equipments.
         Repair of detected leaks.
         Training to BMC staff.
BPL/WS/06 : Supply, laying and testing of  distribution & feeder man mains of 100-450 mm dia. App. 80  Km.
         Rehabilitation  of distribution system and expansion in Gandhi Nagar, Vijay Nagar, One Tree Hills.
         NehruNagar and CTO areas in ward 1, 2, 3, 4.
BPL/WS/07 : Supply, laying and testing of  distribution & feeder man mains of 100-450 mm dia. App.  80 Km.
     Rehabilitation  of distribution system and expansion in Harshwardhan Nagar, Nehru Nagar, Kotra Sultanabad, Aradhana Nagar, Ambedkar Nagar, Sudama Nagar, Chitragupt Nagar, Vaishali Nagar, Dwarkapuri, Kotra Govt. Qtrs., Naya Basera.
         Rehabilitation  of distribution system in 1100 qtrs., E-5, E-6, E-7 Arera and Shahpura   Chaoni Areas.
WS-08 : Supply, laying and testing of  distribution & feeder man mains of 100-450 mm dia. App.  80 Km.
         Rehabilitation  of distribution system in Ward 23,24, 25 and Ashoka Garden areas.
         Rehabilitation of Feeder main in Ward 36 and 37.
BPL/WS/09 : Construction of Service Reservoirs and  Sumps. 
         Vijay Nagar  -ESR  -1.0 ML, Ambedkar Nagar   -ESR-2.25 ML.
         Nehru Nagar -ESR-2.25 ML, Kotra Sultanabad- ESR - 2.25 ML.
BPL/WS/10 : Construction of following Service Reservoirs.
         Kho e fiza  -ESR-  -1.0 ML,City Kotwali –ESR -3.0 ML.
         Shahpura – ESR-2.0  ML,Professor Colony- ESR- 1.0 ML.
BPL/WS/11 : Transmission  mains.
         DI Pipes 350 mm to 500 mm dia to feed New Service reservoirs (Approximate Length-13 Km.).
BPL/WS/12 : Bulk Consumer meters.
          Mechanical Meters to Bulk Consumers.
         1905 Nos. Mechanical meters for Bulk Consumers.
BPL/WS/13 : Rehabilitation of Clear Water Pumping Stations(Phase II) .
       Rehabilitation of Pullpukhta, Badal Mahal and Arera Clear Water Pumping Stations         including replacement of all pumping plants.

DETAILS OF WORK UNDER WASTE WATER AND SANITATION SECTOR
BPL/WW/01 : Sewer network in Gandhinagar, Mohali, Kotra zones. Augmentation of lateral.
         Area : Ward no 4,5,6,9,23,25,26,19,31,37,43  and 44.
BPL/WW/02 –Lot-I : Laying sewers to prevent pollution of Upper Lake .
       Laying Sewer lines &  construction of main holes etc. in following areas:
         Ward no. 3, 4, 5, 6, 7, 23, 26, 27, 28, 29, 31.
         Koh-e- fiza, Ahemdabad housing board and BDA colony, NRI colony, 4 quarters etc to minimize pollution of Upper Lake through Sirin Nala.
         Rajendra Nagar slum, Indra Nagar Slum, Bairagarh etc.
         Kotra, Ginorri area etc.
         Shahid Nagar, Garam Gadda, Fathegarh, Sadar Manzil, Medical Hostel etc.
         Some areas of Shymla Hills, Nadir colony etc.
BPL/WW/02 Lot-II : Sewer System in Old Bhopal Area.
        Laying Sewer lines &  construction of main holes etc. in following areas:
         Ward no. 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 24.
BPL/WW/04 : Additional works of Existing 25 Mld Sewage Treatment Plant at Maholi Dhamkheda.
         Details –Construction of effluent channel and other allied works.
BPL/WW/05 : Sewage Pumping Station and Pumping main.
         Details- Estimated Capacity 32 Mld.
         Location-: Old Bhopal Area.
         Pumping main -: 700 to 900 dia DI Pipe ,Length Approximately – 5 Kms.
BPL/WW/06 : Construction of Public  Toilets (25 Sets).
         Type A : Each with 15 Seats  , Type B: Each with10 Seats.
PMU/WW/01 : Procurement of Sewer Suction cum Jetting, Suction and Jetting machine of various capacities.

DETAILS OF WORK UNDER SOLID WASTE MANAGEMENT SECTOR
BPL/SWM/03 : Development of two new Sanitary Landfill sites including all civil works and operation of landfill sites for one year.
      Details-
         Locations : Fatehpur Dobra, Adampur Chaoni.
        Site infrastructures like entrance gate, watchman’s cabin, compound wall, approach road, weigh bridge record room, office building, green belt, toilet/washing facilities, fire protection system, leachate collection system, drains, including electrical works, water supply and sanitation works.
         1 no. weigh bridge.
         Area of land available at Fatehpura Dobra and Adampur Chaoni is 60.95 acres and 44 acres respectively.
BPL/SWM/01 : Supply of Dumper trucks, Bull dozers, Excavator cum loaders and front-end loaders for operation of Landfill sites.
BPL/SWM/02 : Supply of 1m3 containers, 4.5m3 containers, Refuge compactors and Dumper placers for secondary collection.
BPL/SWM/03 : Supply of containerized wheel Barrows, tricycle, for primary collection etc. 
 